We are pleased to provide this testimonial as requested. We hope that it faithfully captures the enduring collaboration with GNG Consultants through our M&E main contractor that has lasted almost 5 years. Your commitment to our project has been instrumental to the success of project, especially in the Phased Substantial Completion of the project with the TOP of the newly constructed Annex Building at our Poole Road Pumping Station.
It was clear right from the onset that the brown-field project to upgrade our utility infrastructure, located in the midst of a residential area, would be a very challenging project. We are fortunate to have GNG onboard to continuously overcome the numerous design and construction challenges that we faced.
We found most valuable that GNG had used your extensive experience and expertise and led in inter-agency submissions and liaisons to obtain the necessary clearances without compromising our needs. It has been a pleasure working with you, and we look forward to work with you in future.
